VIBESHIFTAI
SYSTEM LIVE
06 TACTICAL STATION

The Task Board

All tasks in The Nexus on an easy-to-read Kanban board. Complete visibility into all activity. The Tactical station is where every promise the system makes becomes a countable unit of work.

How Work Moves

A task's whole life, lane by lane.

NEW

Proposed by morning councils, a human, or the system itself, every task carries context and a contract so the system knows when it's done.

READY

Slate-approved and prioritized. P1 outranks P2; a CONDITION RED repair task outranks everything.

IN PROGRESS

Dispatched to a healthy executor with a context pack of exactly the knowledge it needs. One active at a time outside the mid-day burst window.

NEEDS ATTENTION

Three failed QA correction rounds trip a circuit breaker: blocked, escalated to the human's inbox, post-mortem classifies why.

COMPLETE

Only after a different executor audits the work against its contract. The author never reviews its own work.

The Daily Command Board

The real kanban, captured live — self-improvement queued as [Upgrade Slate] tasks beside product work, one dispatch slot, and a containment strip that shows exactly what the machine is allowed to do right now.

DISPATCH CONTAINMENTCLI slot: Threat-model the MCP boundary (claude-code · testing)Queue: 0codex suspended until Aug 17, 8:03 PM7 recent guardrail incidents
NEWFresh requests and planning work
109
[Upgrade Slate] Reroute Codex dispatches to active executors
Praxis
IDEA / NEWP2CLI SLOT BUSY14f7436a
What: Reroute Codex dispatches to active executors Why: Codex is suspended until Aug 18 due to usage limits [L6]. Heads-up: Proposed by the Upgrade Council on 2026-08-12 — impact high, effort small. Signal provenance: executor-health.
Updated Aug 12, 5:45 AM
[Upgrade Slate] Add git-status pre-flight checks to shared workspaces
Praxis
IDEA / NEWP2CLI SLOT BUSYee974a13
What: Add git-status pre-flight checks to shared workspaces Why: A sibling session reverted uncommitted work in /Volumes/Projects [L8]. Heads-up: Proposed by the Upgrade Council on 2026-08-12 — impact high, effort small. Signal provenance: vault-note.
Updated Aug 12, 5:45 AM
+107 more in the queue
IN PROGRESSActive operator or agent work
1
Threat-model the MCP boundary
TheNexus
IN PROGRESSP017c118c3
Use the MCP 2026, enterprise authorization, audit logging, and PQC findings to define identity, authorization, audit, and migration requirements [knowledge-routing 2026-08-03]
Updated Aug 12, 5:41 PM
one CLI run at a time — by design
COMPLETEFinished work · QA-passed only
545
[Upgrade Slate] Install constrained-verifiable-web-collection ingestion pipeline
Praxis
COMPLETEDP29a775a85
What: Install constrained-verifiable-web-collection ingestion pipeline Why: Tonight’s unverifiable regulatory/model claims prove summaries need deterministic provenance before promotion Heads-up: Proposed by the Upgrade Council on 2026-07-06 — impact high, effort med.
Updated Aug 12, 5:41 PM
Swap the order of ‘The Execution Loop’ and ‘Councils that Earn Their Seats’ sections on the AI Mesh
vibeshiftai
COMPLETEDP0d5051435
What: Swap the order of ‘The Execution Loop’ and ‘Councils that Earn Their Seats’ sections on the AI Mesh page. Why: Reported directly by an end user of the VibeShift AI site. Heads-up: Small, self-contained fix per triage; verify scope on pickup. [feedback PX-VS-9]
Updated Aug 12, 5:20 PM
+543 more shipped

◉ live snapshot · Aug 12, 5:41 PM · 859 tasks across 24 active projects · from the real console

← Back to the console How the slate is planned — Daily Loop → Who does the work — AI Mesh →
GO DEEPER
01Praxis — The Console 02The Daily Loop 03The Problem-Solving Machine 04The AI Mesh 05Knowledge & Memory 06The Task Board 07Power & Economics 08The Projects